A can do a piece of work in 4 days and B can complete
A can do a piece of work in 4 days and B can complete the same work in 12 days. What is the number of days required to do the same work together.
- 2 days
- 3 days
- 4 days
- 5 days
Answer
Tip: If you can try to remember the percentage reciprocals of the first 20 numbers, it will really speed up your calculations.
For e.g (1/2) = 50 %, (1/3) = 33.33 %, (1/ 6) = 16.66% and so on
Now, A's 1 day's work or efficiency = 1 / 4 = 25%
B's efficiency = 1 / 12 = 8.33%
So, total efficiency = (25 + 8.33) % = 33.33%
So, total days required = 100 / 33.33 = 3
The correct option is B.